Skip to content
Sonora
Case studies
Pricing
Contact Us
CASE STUDIES
All case studies
Sonora case studies
Sonora
SONORA
Pump Failure
Learn how RETAL could have saved their pump had they reacted to Sonora alerts.
SONORA
Diamond Cutter Fault
Learn how IKEA got rid of delays by quickly reacting to diamond cutter's shaft imbalance.
SONORA
Fan Fault
Learn how FREDA saved on repairing the fan before the impeller got critically damaged
SONORA
Shredder Engine Fault
Learn how IKEA detected a shaft-related premature issue on a shredding system
SONORA
Gear Fault Detection
Sonora identified a sluice gear fault within 10 days—before external signs appeared—allowing repairs during downtime and saving €3,000 in potential losses.
SONORA
Spindle imbalance
After repeated spindle failures, Sonora pinpointed a tool imbalance causing bearing damage, preventing €7,500 per spindle replacement.
SONORA
Planer bearing fault
Sonora detected early wear in a planer head bearing, enabling a scheduled repair and avoiding €1,200 in unexpected downtime costs.
Get in touch
Please enable JavaScript in your browser to complete this form.
Please enable JavaScript in your browser to complete this form.
Email
Email
*
Contact Me
Sonora
Case studies
Contact Us
ArrowForward
black-line
caret-down
CheckBox
CheckBoxOutlineBlank
CheckCircleOutline
ChevronLeft
ChevronRight
close
facebook
graphicLinesRight
graphicLinesRightMobile
green-line-with-circle
hamburger
icons8-linkedin
info
linkedin-square
linkedin
LocalPhone
LocalPostOffice
LocationOn
LocationOnBlue
pause
PersonOutline
play
RadioButton
RadioButtonActive
RectangleBlue
RectangleGreen
RectangleTilted